Tuesday, February 7, 2012

On a slow day we...

Everyday isn't as busy as today was, but they sure seem to be. 

Whenever we start something that needs to be completed on a time schedule...something goes wrong.  Today we are topdressing fairways and the spinner broke off while topdressing the second hole of the day.  Weld it up and get going.
We needed to drag the sand in afterwards so we built another drag mat.

The bridge railing needs to be installed so we started cutting the wood.


Altered the posts to fit into the sockets...

Moved fertilizer around to use later on the greens and to move it out of the way of all the work...

Topdressed the fairways

Mowed fairways, tees, collars, approaches...


Needle tined greens...


Cut out and graded for some concrete stairs at the clubhouse...




Drug the sand into the fairways...






Started installing the posts for the railing on 16 bridge...



Router, table saw, wrenches, epoxy, sledge hammer...you name it we used it o this bridge... 







After the needle tine passed over the greens, we fertilized them, topdressed them, drug them and rolled them.




More fairway dragging...




Custom railings take time to create...




Tonight the wind will pick up and we will be cleaning up Tuesday... all in the life of a greenkeeper!